Our prefabricated steel structure workshop/plant uses Q235B/Q355B carbon structural steel as the core raw material, adopts a portal rigid frame as the main structure, and is constructed through factory standardized prefabrication and on-site modular assembly. It is the optimal solution for modern industrial construction.
The product features light weight yet high load-bearing capacity, and is designed in compliance with Grade 8 seismic resistance and 120km/h wind load resistance standards, with a service life of up to 50 years.
Types of steel building structures include portal rigid steel frames, frame structures, truss structures, and grid structures. Understanding these systems is essential to design your project correctly as stress forms vary by application.
Customizable typhoon resistant, sand proof, high temperature resistant, and anti-corrosion solutions for global environments.
All components are factory prefabricated. Only bolt assembly is needed on site, shortening construction by 60%.
National standard high-grade steel with excellent fireproof and anti-corrosion performance for 50+ years of service.
Flexible layouts for workshops, warehouses, or cold storage, saving more than 30% in comprehensive costs.
| Component | Technical Details |
|---|---|
| Main Steel Structure | Q235B, Q355B Steel, Welded/Hot-rolled H-section, I-section, Box Frame |
| Surface Treatment | Sa2.5 Shot Blasting, Alkyd/Epoxy Zinc-rich Paint, Hot-dip Galvanizing |
| Purlins | C-section, Z-section Profiles, Electro/Hot-dip Galvanizing |
| Bracing System | Cross Bracing, Column Bracing, Knee Bracing, Tie Rods |
| Wall & Roof Cladding | PPGI/PPGL Sheets, Sandwich Panels (Rockwool, EPS, PU) |
| Doors & Windows | Electric Roller Shutter, Sliding Doors; UPVC/Aluminum Windows |
Our expert team provides one-stop customized solutions including consulting, R&D, design, manufacturing, and installation. We serve sectors such as oil & gas, mining, energy, and infrastructure with proven reliability.
Steel components are moisture-wrapped and steel-strapped. Key parts are separately packed for collision prevention. All components are sorted and loaded per installation order to ensure swift unloading and setup.