10000 Tons Per Year K2so4 Production Line Mannheim Furnace

Customization: Available
After-sales Service: Online Service
Warranty: 12 Months

Product Description

📋 Basic Information
Model NO.
MCC/PLC/DCS
Automatic
Dcs, PLC, Mcc
Color
Customized
Material
Silicon Bricks, Steel, FRP
Burning System
Coal, Gas, Oil
Capacity
10000 Tons Per Line
Certificate
ISO
Raw Material
H2SO4 and KCl
Finished Type
Powder, Granule
Trademark
OPCT
Origin
China
HS Code
8474809090
🏗️ Product Description

K2SO4 production line Mannheim furnace with capacity 10000 tons per year

10000 Tons Per Year K2so4 Production Line Mannheim Furnace

Specializing in the design, manufacture, installation, and technology transfer of potassium sulphate production equipment. Based on the German Mannheim Furnace, we have improved the construction and materials to achieve even heating, complete reaction, and low energy consumption. New materials and technology are applied to the hydrochloric acid absorption section, enhancing efficiency and resolving environmental issues.

Our specialized team of designers and installation groups provides years of skilled experience, ensuring smooth design, manufacturing, and stable process operation guidance.
🖼️ Project Samples & Construction Sites
🚀 Key Advantages

⚙️ Technical Advantages

  • Corrosion-resistant special materials for key components, ensuring long service life.
  • Waste recovery system to recycle hydrochloric acid (HCl) for environmental compliance.
  • Optimized HCl absorption system for higher final product quality.
  • Improved flue design for maximum energy efficiency.
  • PLC automatic control for feedstock ratio and labor cost savings.
  • Stable production with large output and low coal consumption.

🚢 Operation & Logistics

  • Professional logistics team with extensive container and bulk transport experience.
  • Powerful customs clearance capability.
  • Comprehensive database for SOP equipment suppliers and shipping.
  • Strong integration of export/import documents (C/O, Embassy certifications).
📦 Package & Shipping
Package and shipping
📜 Certification
Certificates
FAQ
1. Are you a Trading Company or Manufacturing Factory?
We are both a manufacturer and a trading company. We have had our own factory for almost seven years and provide dedicated service for overseas customers.
2. How about the delivery time?
Typically 60 days after receiving the deposit based on the MOQ. Standard orders for a 20ft container usually take 30-35 days to finish.
3. How can you guarantee product quality?
We strictly follow the ISO9001:2015 quality control system. Our professional QC team performs final inspections according to QC instructions before packing.
4. What are the payment terms?
Basically, we accept T/T, L/C at sight, Western Union, and Alipay.
5. Can you do OEM orders?
Yes, we accept all OEM orders. Please contact us with your design, and we will offer a reasonable price as soon as possible.
6. What capacities can you provide?
One set of Mannheim furnace plant capacity is 10,000 tons per year. We can provide multiple sets of equipment based on your specific requirements.

Related Products